GETTING STARTED

We decide where to start, together.

From part review to POC, cell installation and production stabilization — deployment runs in 4 phases. We tell you the schedule, deliverables and checkpoints of each phase in advance.

PHASES

Deployment in 4 phases

A rough schedule guide. It can shrink or grow with the part and line conditions, and after each phase we decide together whether to go on to the next.

  1. 1 1–2 weeks

    Part and requirements review

    We review vision recognition and alignment feasibility with part samples. Robot and line conditions are checked at the same time and a configuration is proposed.

  2. 2 2–4 weeks

    POC (proof of concept)

    Pick feasibility is verified with your actual parts in our cell. A draft Recipe and the operating flow are confirmed together.

  3. 3 1–3 weeks

    Cell installation and setup

    The cell is installed on site and the integrated vision, robot and feeder setup is carried out — through coordinate alignment and Recipe registration.

  4. 4 2–4 weeks

    Production stabilization

    Variations found during the first production runs are absorbed to reach stable operation. Later models are added with a Recipe.

DETAILS

Deliverables per phase

At the end of each phase you receive the following deliverables.

1

Part and requirements review

1–2 weeks

We review vision recognition and alignment feasibility with part samples. Robot and line conditions are checked at the same time and a configuration is proposed.

  • Review result report
  • Recommended configuration
  • Expected schedule
2

POC (proof of concept)

2–4 weeks

Pick feasibility is verified with your actual parts in our cell. A draft Recipe and the operating flow are confirmed together.

  • POC result video and data
  • Draft Recipe
  • Production cell specification fixed
3

Cell installation and setup

1–3 weeks

The cell is installed on site and the integrated vision, robot and feeder setup is carried out — through coordinate alignment and Recipe registration.

  • Integrated setup complete
  • Coordinate alignment verified
  • Operator training
4

Production stabilization

2–4 weeks

Variations found during the first production runs are absorbed to reach stable operation. Later models are added with a Recipe.

  • Stable production operation
  • Operating manual
  • After-sales support structure

CHECKLIST

Things to check before you contact us

Sharing the items below makes the review faster and more accurate. You do not have to fill in everything — we sort it out together.

Part conditions

  • Part size, material and surface condition
  • Monthly volume / cycle time
  • High-mix or not (number of models)
  • Input form (bulk, tray, tape)

Robot and line conditions

  • Robot brand and model in use
  • Existing PLC/HMI environment
  • Space available for the cell
  • Interface signals with the line

Operating conditions

  • Target production start date
  • Operators' experience level
  • Plans to add models later
  • Scope of after-sales support

FAQ

Frequently asked questions

How long does the deployment review take? +
Once we receive your part samples and requirements, we define the review scope and let you know the schedule. If a POC is needed, we work out that schedule together according to its scope.
Can we keep using our existing robot? +
Yes. How deep we go differs by robot. Most robots receive the pick coordinates from us, and for two robots — Hyundai Robotics and Agilebot — we handle the robot program itself from our screen. You can set up without buying a new robot.
Where is the POC carried out? +
In our verification cell, with your actual part samples. We share the results as video and data.
How do we add a model after production has started? +
The cell does not need to be rebuilt. Register the new model's conditions as a Recipe and run it on the same cell.
How far does after-sales support go? +
Remote diagnostics, operating checks and adding Recipes for new models. The detailed scope is agreed together during deployment.

START

Start with a parts review.

Tell us about your samples and line conditions, and we will define the review scope and let you know the schedule.